ASVAB Camp Get the appGoogle Play
AR · Lesson test

Work and Combined-Rate Problems Lesson Test

Work-rate questions are some of the more demanding items in Arithmetic Reasoning, so this lesson test is a good gauge of advanced readiness. It offers 15 original ASVAB-style questions based on the Work and Combined-Rate Problems lesson, including two and three workers, unknown worker rates, partial work, changing teams, fill and drain systems and production totals.

  • 15-question lesson test
  • 35 more practice questions
  • Every answer explained

Lesson test

15 questions · tap an option to check it
Question 1 of 15 · easy

A landscaper can mow a large park alone in 8 hours. After working for 3 hours, what fraction of the park is still unmowed?

Show the answer

Answer: A

Correct answer: 5/8. Each hour the landscaper mows of the park, so 3 hours of work covers . The part still unmowed is

  • A (correct): Work done is 3/8, and subtracting it from the whole park leaves 5/8.
  • B: This is the part already mowed, not the part that remains.
  • C: This is the amount mowed in a single hour, not the unmowed fraction.
  • D: This compares hours worked to hours left instead of measuring work against the whole job.
Question 2 of 15 · easy

One clerk can file a batch of records in 4 hours, and a second clerk can file the same batch in 12 hours. Working together, how long will it take them to file the batch?

Show the answer

Answer: C

Correct answer: 3 hours. Add the hourly rates:

of the batch per hour. Inverting gives 3 hours.

  • A: Averaging the times ignores that the team is faster than the faster clerk.
  • B: Adding the two times makes the team slower than either clerk, which cannot happen.
  • C (correct): The combined rate is 1/3 of the batch per hour, so the job takes 3 hours.
  • D: This is the combined rate per hour; it still has to be inverted to get the time.
Question 3 of 15 · easy

A hose can fill a garden pond in 4 hours, and a leak can empty the full pond in 12 hours. If the hose runs while the leak stays open, how long will it take to fill the empty pond?

Show the answer

Answer: B

Correct answer: 6 hours. The hose adds per hour and the leak removes per hour. Net rate:

pond per hour, so filling takes 6 hours.

  • A: Adding the leak's rate treats it as a second hose instead of subtracting it.
  • B (correct): The net filling rate is 1/12 subtracted from 1/4, which is 1/6 pond per hour, giving 6 hours.
  • C: Adding the two times does not account for how the hose and leak work against each other.
  • D: Subtracting the times (12 − 4) does not combine the rates properly.
Question 4 of 15 · easy

Machine A prints 180 labels in 4 minutes. Machine B prints 150 labels in 6 minutes. Running together, how many labels per minute do the two machines print?

Show the answer

Answer: B

Correct answer: 70 labels per minute. Machine A prints

180 ÷ 4 = 45

labels per minute and Machine B prints

150 ÷ 6 = 25

labels per minute. Together they print

45 + 25 = 70

labels per minute.

  • A: Subtracting the two rates is what an opposing process needs, but both machines are adding labels.
  • B (correct): Each machine's rate is found first (45 and 25 labels per minute) and then the rates are added.
  • C: Adding the label counts gives total output from two different time periods, not a rate per minute.
  • D: Dividing the total labels, 330, by the total minutes, 10, mixes the two machines' different run times.
Question 5 of 15 · easy

A carpenter can frame a shed in 6 hours alone, and a helper can frame it in 8 hours alone. Without doing the exact calculation, which value could be the time for them to frame the shed together?

Show the answer

Answer: C

Correct answer: 3.4 hours. Working together must be faster than the faster worker alone, so the time is under 6 hours. It is at least half of 6 hours, or 3 hours. Only 3.4 hours lies between 3 and 6 hours; the exact value is 24/7, about 3.4 hours.

  • A: This is the average of the two times, but a team is always faster than its faster member.
  • B: Adding the times makes the team slower than either person alone.
  • C (correct): This falls between half the faster time (3 hours) and the faster time (6 hours), and it matches the exact value of 24/7 hours.
  • D: Even two workers as fast as the carpenter would need 3 hours, so 2.5 hours is too short.
Question 6 of 15 · medium

One pump can empty a flooded basement in 12 hours, and a second pump can empty it in 18 hours. If both pumps run together, how long will it take to empty the basement?

Show the answer

Answer: A

Correct answer: 7 hours 12 minutes. Use the common denominator 36:

per hour. The time is

hours

Since 0.2 hour is 12 minutes, that is 7 hours 12 minutes.

  • A (correct): The combined rate is 5/36 per hour, so the time is 36/5 = 7.2 hours, and 0.2 hour equals 12 minutes.
  • B: Averaging the two times ignores that both pumps work at once.
  • C: Adding the times would make two pumps slower than one.
  • D: This reads 0.2 hour as 20 minutes; 0.2 of 60 minutes is only 12 minutes.
Question 7 of 15 · medium

Three scanners can finish digitizing a stack of files alone in 3 hours, 4 hours and 6 hours. If all three run at the same time, how long will the job take?

Show the answer

Answer: D

Correct answer: 1 hour 20 minutes. Over a denominator of 12:

of the job per hour. Inverting gives hours, which is 1 hour 20 minutes.

  • A: This is 3/4 of an hour, the combined rate, used as the time without inverting.
  • B: Adding the three times makes the team slower than any single scanner.
  • C: This is the average of the three times, which is longer than the fastest scanner alone.
  • D (correct): The combined rate is 3/4 of the job per hour, so the time is 4/3 hours, or 1 hour 20 minutes.
Question 8 of 15 · medium

Two technicians working together can rewire a trailer in 8 hours. One of them alone needs 12 hours. How long would the other technician need working alone?

Show the answer

Answer: D

Correct answer: 24 hours. Subtract the known rate from the team rate:

The other technician alone needs 24 hours.

  • A: Adding the rates instead of subtracting combines the team with one of its own members.
  • B: Adding the times does not separate the unknown worker's rate from the team rate.
  • C: Subtracting the times gives a worker faster than the whole team, which is impossible.
  • D (correct): The missing rate is 1/8 minus 1/12, which is 1/24, so the job takes 24 hours alone.
Question 9 of 15 · medium

A crew paints 4 identical classrooms in 6 hours. Working at the same rate, how long will the crew need to paint 10 of these classrooms?

Show the answer

Answer: B

Correct answer: 15 hours. The crew paints

classroom per hour. For 10 classrooms:

hours
  • A: Multiplying 10 by the rate of 2/3 room per hour gives a number with the wrong meaning; time is rooms divided by rate.
  • B (correct): At 2/3 classroom per hour, 10 classrooms take 10 divided by 2/3, or 15 hours.
  • C: Multiplying 10 rooms by 6 hours treats 6 hours as the time for each single room.
  • D: Simply doubling the time fits 8 rooms, but 10 rooms is 2.5 times the original job.
Question 10 of 15 · medium

A welder can finish a set of brackets alone in 9 hours. She works alone for 3 hours, and then a coworker who could do the whole set alone in 18 hours joins her. How many hours after the coworker joins will the brackets be finished?

Show the answer

Answer: D

Correct answer: 4 hours. In 3 hours the welder finishes

leaving . Together they do

per hour.

  • A: This is how long the coworker alone would need for the remaining two-thirds, leaving out the welder's help.
  • B: This is the total elapsed time including her first 3 hours, but the question asks for time after the coworker joins.
  • C: This is the time for the whole job together, ignoring the third already finished.
  • D (correct): Two-thirds of the job remains, and at 1/6 per hour that takes 4 hours.
Question 11 of 15 · medium

A storage hopper already holds 300 pounds of grain. Grain pours in at 90 pounds per minute while 60 pounds per minute flows out the bottom. The hopper holds 1,200 pounds when full. How many minutes will it take to fill the hopper?

Show the answer

Answer: D

Correct answer: 30 minutes. The net gain is

90 − 60 = 30 pounds

per minute. The hopper needs

1,200 − 300 = 900

more pounds, so the time is

900 ÷ 30 = 30 minutes
  • A: Dividing the full 1,200 pounds by 30 forgets the 300 pounds already in the hopper.
  • B: Adding the inflow and outflow treats the outflow as helping to fill the hopper.
  • C: Using only the 90-pound inflow ignores the grain flowing out the bottom.
  • D (correct): The hopper gains 30 pounds per minute and needs 900 more pounds, which takes 30 minutes.
Question 12 of 15 · hard

Two cleaners can each clean an office building alone, one in 6 hours and the other in 12 hours. They work together for 2 hours, and then the faster cleaner leaves. The slower cleaner finishes the rest alone. How many hours does the whole job take?

Show the answer

Answer: B

Correct answer: 8 hours. Together they do

per hour, so in 2 hours they finish . The slower cleaner needs

hours

for the other half. Total:

2 + 6 = 8 hours
  • A: This has the faster cleaner finishing the second half, but the faster one is the one who left.
  • B (correct): Half the job is done in the first 2 hours, and the slower cleaner needs 6 more hours for the remaining half.
  • C: This is only the slower cleaner's solo time for the last half; the first 2 hours must be added.
  • D: This assumes both cleaners stay for the whole job.
Question 13 of 15 · hard

An inlet pipe can fill an empty tank in 5 hours. The inlet runs alone for 2 hours, and then a drain that can empty a full tank in 10 hours is accidentally opened and left open. How many more hours will it take to fill the tank?

Show the answer

Answer: C

Correct answer: 6 hours. After 2 hours, of the tank is full and remains. With the drain open the net rate is

tank per hour.

  • A: Adding the drain's rate to the inlet's treats the drain as if it were filling the tank.
  • B: This includes the first 2 hours, but the question asks how many more hours are needed.
  • C (correct): The remaining 3/5 of the tank fills at a net 1/10 tank per hour, which takes 6 hours.
  • D: This is the time for the remaining 3/5 with the inlet alone, ignoring the open drain.
Question 14 of 15 · hard

Three workers together can assemble a shipment of shelving units in 2 hours. Working alone, the first worker needs 6 hours and the second needs 4 hours. How long would the third worker need to assemble the shipment alone?

Show the answer

Answer: A

Correct answer: 12 hours. Subtract both known rates from the team rate:

The third worker alone needs 12 hours.

  • A (correct): The third worker's rate is 1/2 minus 1/6 minus 1/4, which is 1/12, so the job takes 12 hours alone.
  • B: Subtracting times (6 + 4 − 2) does not work; rates must be subtracted, not hours.
  • C: Subtracting only the first worker's rate leaves out the second worker's share.
  • D: Adding all the rates instead of subtracting gives a worker faster than the whole team.
Question 15 of 15 · hard

Printer A prints 600 pages in 10 minutes, and Printer B prints 450 pages in 9 minutes. For a 2,500-page order, Printer A runs alone for 5 minutes, and then Printer B starts and both run until the order is done. How many minutes does the whole order take?

Show the answer

Answer: A

Correct answer: 25 minutes. Printer A prints 60 pages per minute and Printer B prints 50, so together they print 110 per minute. In the first 5 minutes A prints 300 pages, leaving 2,200. Those take

2,200 ÷ 110 = 20 minutes

so the order takes

5 + 20 = 25 minutes
  • A (correct): Printer A prints 300 pages alone in 5 minutes, and the remaining 2,200 pages take 20 minutes at 110 pages per minute.
  • B: This is only the time after Printer B starts; the first 5 minutes must be added.
  • C: Dividing 2,500 by 110 assumes both printers ran from the start.
  • D: Dividing 2,500 by 60 has Printer A doing the whole order alone.

More practice

35 extra questions
Practice 1 of 35 · hard

Two roofers can each reshingle a garage alone, one in 10 hours and the other in 15 hours. They work together for 3 hours, and then the faster roofer is called to another site. The slower roofer finishes the job alone. How many hours does the whole job take?

Show the answer

Answer: D

Correct answer: 10.5 hours. Together the rate is

per hour, so in 3 hours they finish of the job.

The slower roofer does per hour, so the remaining half takes

hours

Total:

3 + 7.5 = 10.5 hours
  • A: This is the time if both roofers stayed for the entire job; it ignores that the faster one left.
  • B: This is only the time the slower roofer works alone after the other leaves; the first 3 hours must be added.
  • C: This assumes the faster roofer stayed to finish the second half, but it was the slower roofer who finished.
  • D (correct): Together they finish 1/2 in 3 hours; the slower roofer needs 7.5 more hours for the other half, so 3 + 7.5 = 10.5 hours.
Practice 2 of 35 · hard

A technician can run the network cabling for an office alone in 20 hours. She works alone for 5 hours, and then a coworker who could do the whole job alone in 30 hours joins her. How many hours does the job take from start to finish?

Show the answer

Answer: C

Correct answer: 14 hours. Alone for 5 hours she finishes

leaving .

Team rate:

per hour, so the rest takes

hours

Total:

5 + 9 = 14 hours
  • A: This is only the time after the coworker joins; the question asks for total elapsed time, so the first 5 hours must be added.
  • B: This is how long the two would need for the entire job if they started together, ignoring the solo stage.
  • C (correct): She finishes 1/4 alone, the pair then needs 9 hours for the remaining 3/4, and 5 + 9 = 14 hours.
  • D: This adds the solo 5 hours to a full 12-hour team job, forgetting that 1/4 of the work was already done.
Practice 3 of 35 · medium

One deckhand can scrape and repaint a boat's railing in 7 hours, and another deckhand can do the same job in 14 hours. Working together, how long will it take them?

Show the answer

Answer: B

Correct answer: 4 hours 40 minutes. Add the rates over a common denominator:

of the job per hour.

Invert to get the time:

hours

which is 4 hours 40 minutes.

  • A: This is half of the faster deckhand's time, which would only be true if both worked as fast as the faster one.
  • B (correct): The combined rate is 3/14 of the job per hour, so the time is 14/3 hours, which is 4 hours 40 minutes.
  • C: This averages the two times; a team is always faster than either worker alone.
  • D: This adds the two times instead of adding the rates.
Practice 4 of 35 · medium

Two forklift operators working together can unload a trailer in 3 hours. One of them working alone needs 5 hours. How long would the other operator need to unload the trailer alone?

Show the answer

Answer: D

Correct answer: 7.5 hours. The unknown rate is the team rate minus the known rate:

Invert:

hours
  • A: This subtracts the times (5 - 3) instead of the rates.
  • B: This adds the two times, which has no meaning for work rates.
  • C: This adds the rates instead of subtracting the known worker's rate from the team rate.
  • D (correct): Subtracting rates gives 1/3 - 1/5 = 2/15 of the trailer per hour, so the other operator alone needs 15/2 = 7.5 hours.
Practice 5 of 35 · easy

A court reporter can transcribe a full day of testimony in 6 hours. What fraction of the transcript does she complete in each hour of work?

Show the answer

Answer: D

Correct answer: 1/6. A worker who needs h hours for a job completes of it each hour. Here h = 6, so she completes of the transcript per hour.

  • A: This is the number of hours for the whole job, not the fraction finished per hour.
  • B: This is the fraction still left after the first hour, not the fraction done each hour.
  • C: This halves the correct rate for no reason, as if the job took 12 hours.
  • D (correct): A job that takes 6 hours alone is done at a rate of 1 divided by 6, or 1/6 of the job per hour.
Practice 6 of 35 · hard

Two inlet pipes can fill an empty water tower in 6 hours and 10 hours, respectively. A drain can empty the full tower in 15 hours. If both inlets and the drain are all open, how long will it take to fill the empty tower?

Show the answer

Answer: A

Correct answer: 5 hours. Use a common denominator of 30. Inlets add, the drain subtracts:

The tower fills at 1/5 per hour, so it takes 5 hours.

  • A (correct): Net rate is 1/6 + 1/10 - 1/15 = 1/5 of the tower per hour, so filling takes 5 hours.
  • B: This adds the drain's rate as if it were a third inlet; a drain's rate must be subtracted.
  • C: This is the time for the two inlets with the drain closed; it ignores the drain.
  • D: This treats the net rate of 1/5 tower per hour as the time, forgetting to invert it.
Practice 7 of 35 · medium

Visitors join the line for a theme-park ride at 55 people per minute, and the ride loads 40 people per minute. Starting with no line, how many minutes will it take for 450 people to be waiting in line?

Show the answer

Answer: D

Correct answer: 30 minutes. The net growth rate is arrivals minus removals:

55 - 40 = 15

people per minute.

Time = amount / rate =

450 / 15 = 30 minutes
  • A: This adds the two rates (95 per minute) even though loading removes people from the line.
  • B: This uses only the arrival rate of 55 per minute and ignores the people being loaded.
  • C: This divides 450 by the loading rate of 40, which does not measure how fast the line grows.
  • D (correct): The line grows by 55 - 40 = 15 people per minute, and 450 / 15 = 30 minutes.
Practice 8 of 35 · medium

Bottling machine A fills 960 bottles in 8 minutes, and machine B fills 700 bottles in 10 minutes. Running together, how many minutes will they need to fill 3,800 bottles?

Show the answer

Answer: B

Correct answer: 20 minutes. Find each rate:

960 / 8 = 120

bottles per minute and

700 / 10 = 70

bottles per minute.

Combined:

120 + 70 = 190

per minute. Time:

3,800 / 190 = 20 minutes
  • A: This averages the two rates (95 per minute) instead of adding them.
  • B (correct): A fills 120 per minute and B fills 70 per minute, so together 190 per minute, and 3,800 / 190 = 20 minutes.
  • C: This uses machine A's rate of 120 per minute alone and leaves out machine B.
  • D: This uses machine B's rate of 70 per minute alone and leaves out machine A.
Practice 9 of 35 · hard

Crew A can shingle 2 identical roofs in 9 hours, and crew B can shingle 3 of the same roofs in 9 hours. Working together at these rates, how long will the two crews need to shingle 10 of these roofs?

Show the answer

Answer: D

Correct answer: 18 hours. Here one job means one roof. Crew A works at roof per hour and crew B at , so together roof per hour.

Time = work / rate:

hours
  • A: This multiplies 10 roofs by the rate of 5/9 roof per hour instead of dividing by it.
  • B: This is crew B's time working alone; crew A's help is left out.
  • C: This averages the two crews' solo times (45 and 30 hours) instead of adding their rates.
  • D (correct): Together the crews shingle 5 roofs every 9 hours, or 5/9 roof per hour, so 10 roofs take 10 / (5/9) = 18 hours.
Practice 10 of 35 · hard

Three pumps can each drain a flooded storm cellar alone, in 8 hours, 12 hours and 24 hours. All three run together for 2 hours, and then the fastest pump breaks down. How many more hours will the other two pumps need to finish draining the cellar?

Show the answer

Answer: D

Correct answer: 4 hours. With a common denominator of 24, the three rates are

per hour, so in 2 hours they finish .

The two slower pumps drain

per hour, so the remaining half takes

hours
  • A: This is the total time for the whole job; the question asks only for the time after the breakdown.
  • B: This assumes the pumps keep working at the full three-pump rate after the fastest one stops.
  • C: This is how long the two remaining pumps would need for the entire job, ignoring the half already done.
  • D (correct): All three drain 1/4 per hour, so 1/2 is done after 2 hours; the remaining two drain 1/8 per hour, so the last half takes 4 hours.
Practice 11 of 35 · easy

A road crew can regrade a stretch of gravel road in 10 days. What fraction of the road has the crew regraded after working 4 days?

Show the answer

Answer: B

Correct answer: 2/5. Work = rate x time. The rate is of the road per day, so in 4 days the crew finishes

of the road.

  • A: This is the fraction still left to regrade, not the fraction already done.
  • B (correct): The crew does 1/10 per day, and 4 days times 1/10 equals 4/10, which simplifies to 2/5.
  • C: This is the fraction done in one day, not in 4 days.
  • D: This inverts the number of days worked instead of multiplying the rate by the time.
Practice 12 of 35 · hard

An inlet pipe alone can fill a cattle trough in 4 hours. With a cracked drain valve open at the same time, the trough takes 10 hours to fill. Working alone, how long would the leaking drain take to empty a full trough?

Show the answer

Answer: A

Correct answer: 6 hours 40 minutes. The combined rate is the inlet rate minus the drain rate, so the drain rate is the difference:

Invert: hours = 6 hours 40 minutes.

  • A (correct): The drain's rate is 1/4 - 1/10 = 3/20 trough per hour, so it empties the trough in 20/3 hours, or 6 hours 40 minutes.
  • B: This subtracts the times (10 - 4) instead of subtracting the rates.
  • C: This adds the inlet and combined rates instead of subtracting to find what the drain removes.
  • D: This adds the two times, which does not give any rate in the problem.
Practice 13 of 35 · medium

One crew can clear brush from a firebreak in 14 days, and a second crew can clear it in 21 days. Working together, how many days will the two crews need?

Show the answer

Answer: C

Correct answer: 8.4 days. Pick a job size both times divide evenly: the LCM of 14 and 21 is 42 units.

The crews clear

42 / 14 = 3
and
42 / 21 = 2

units per day, so 5 units per day together. Time:

42 / 5 = 8.4 days
  • A: This is half of the faster crew's time, which would require both crews to work as fast as the faster one.
  • B: This averages the two times; working together must be faster than either crew alone.
  • C (correct): Calling the job 42 units, the crews clear 3 and 2 units per day, so 5 together, and 42 / 5 = 8.4 days.
  • D: This adds the times instead of adding the rates.
Practice 14 of 35 · easy

A postal clerk can sort a truckload of mail in 2 hours, and a trainee can sort the same load in 6 hours. Working together, how long will it take them to sort the load?

Show the answer

Answer: A

Correct answer: 1.5 hours. Add the rates:

of the load per hour.

Invert to get the time:

hours
  • A (correct): Together they sort 1/2 + 1/6 = 2/3 of the load per hour, so the time is 3/2 = 1.5 hours.
  • B: This averages the two times; together they must beat the faster clerk's 2 hours.
  • C: This adds the two times instead of adding the rates.
  • D: This stops at the combined rate of 2/3 load per hour and forgets to invert it.
Practice 15 of 35 · easy

Working together, a team of stock clerks completes 1/5 of a warehouse inventory count each hour. At this rate, how long will the team take to finish the entire count?

Show the answer

Answer: A

Correct answer: 5 hours. Time = work / rate. The whole job is 1, so the time is

hours
  • A (correct): A rate of 1/5 of the job per hour means the whole job takes 1 divided by 1/5, or 5 hours.
  • B: This treats the rate of 1/5 as 1/5 of an hour; the rate must be inverted to find the time.
  • C: This halves the correct time, as if the team rate were 2/5 per hour.
  • D: This counts only the 4/5 of the job left after the first hour.
Practice 16 of 35 · medium

Three tractors can each plow a field alone in 6 hours, 9 hours and 18 hours. If all three tractors plow the field at the same time, how long will the job take?

Show the answer

Answer: B

Correct answer: 3 hours. Rewrite each rate with denominator 18:

The tractors plow 1/3 of the field per hour, so they need 3 hours.

  • A: This divides the fastest time by 3, which would require all three tractors to be as fast as the fastest one.
  • B (correct): Over a common denominator of 18 the rates add to 6/18 = 1/3 of the field per hour, so the job takes 3 hours.
  • C: This averages the three times; the team must be faster than any single tractor.
  • D: This adds the three times instead of adding the three rates.
Practice 17 of 35 · medium

A mason can lay a stone patio alone in 16 hours. He works alone for 6 hours, and then a partner who could lay the whole patio alone in 8 hours joins him. How long after the partner joins will the patio be finished?

Show the answer

Answer: B

Correct answer: 3 hours 20 minutes. In 6 hours the mason finishes

leaving .

Team rate:

per hour. Time:

hours

which is 3 hours 20 minutes.

  • A: This is the total elapsed time including the mason's first 6 hours; the question asks only for the time after the partner joins.
  • B (correct): After 6 hours 5/8 remains; together they lay 3/16 per hour, and 5/8 divided by 3/16 is 10/3 hours, or 3 hours 20 minutes.
  • C: This is the time for the pair to lay the entire patio, ignoring the 3/8 already finished.
  • D: This lets the partner finish the remaining 5/8 alone and leaves out the mason's continued work.
Practice 18 of 35 · easy

One bakery line produces 48 rolls per minute, and a second line produces 32 rolls per minute. If both lines run at the same time, how many minutes will it take to produce 2,000 rolls?

Show the answer

Answer: C

Correct answer: 25 minutes. When output is counted in items, add the rates directly:

48 + 32 = 80

rolls per minute.

Time =

2,000 / 80 = 25 minutes
  • A: This uses only the first line's rate of 48 rolls per minute.
  • B: This uses only the second line's rate of 32 rolls per minute.
  • C (correct): Together the lines make 48 + 32 = 80 rolls per minute, and 2,000 / 80 = 25 minutes.
  • D: This subtracts the rates (48 - 32 = 16) even though both lines are adding rolls.
Practice 19 of 35 · medium

An engineer platoon strings 1.5 miles of field telephone wire in 6 hours. Working at the same rate, how long will the platoon take to string 4 miles of wire?

Show the answer

Answer: A

Correct answer: 16 hours. Find the rate for one unit of work: 1.5 miles / 6 hours = 0.25 mile per hour.

Then time = work / rate =

4 / 0.25 = 16 hours
  • A (correct): The rate is 1.5 / 6 = 0.25 mile per hour, so 4 miles take 4 / 0.25 = 16 hours.
  • B: This multiplies 4 miles by the rate of 0.25 mile per hour instead of dividing by it.
  • C: This adds the extra 2.5 miles to the 6 hours as if each mile took 1 hour.
  • D: This multiplies 4 by 6, treating the original job as 1 mile instead of 1.5 miles.
Practice 20 of 35 · medium

A ship's ballast pump can fill an empty ballast tank in 8 hours. A faulty valve lets water drain out at a rate that would empty a full tank in 24 hours. With the pump running and the valve leaking, how long will it take to fill the empty tank?

Show the answer

Answer: C

Correct answer: 12 hours. The pump adds and the leak subtracts:

The tank gains 1/12 per hour, so it fills in 12 hours.

  • A: This adds the leak's rate to the pump's rate; a drain's rate must be subtracted.
  • B: This subtracts the times (24 - 8) instead of the rates.
  • C (correct): The net rate is 1/8 - 1/24 = 2/24 = 1/12 tank per hour, so the tank fills in 12 hours.
  • D: This adds the two times, which has no meaning for rates.
Practice 21 of 35 · easy

Two identical forklifts can each load a cargo container alone in 10 hours. If both forklifts work on the same container at the same time, how long will the loading take?

Show the answer

Answer: C

Correct answer: 5 hours. Add the rates:

of the container per hour. Invert: 5 hours.

  • A: This adds the two times; a second worker shortens the job instead of lengthening it.
  • B: This averages the two equal times, which ignores the extra help.
  • C (correct): Each forklift does 1/10 per hour, so together they do 2/10 = 1/5 per hour and need 5 hours.
  • D: This stops at the combined rate of 1/5 container per hour and forgets to invert it.
Practice 22 of 35 · medium

An inspector can review a set of building plans alone in 10 hours. After working on them for 6 hours, he is reassigned, and a second inspector who could review the whole set alone in 5 hours finishes the job by herself. How many hours does the second inspector work?

Show the answer

Answer: B

Correct answer: 2 hours. Work done by the first inspector:

so remains.

The second inspector's rate is per hour, so she needs

hours
  • A: This finishes the remaining 2/5 at the first inspector's slower rate of 1/10 per hour.
  • B (correct): The first inspector finishes 6/10 = 3/5, leaving 2/5; at 1/5 per hour the second inspector needs 2 hours.
  • C: This divides the 3/5 already finished by the second inspector's rate instead of the 2/5 that remains.
  • D: This has both inspectors working together on the rest, but the first one was reassigned.
Practice 23 of 35 · medium

A carpenter can build a set of kitchen cabinets alone in 9 days, and his partner can build the same set alone in 12 days. Working together, about how long will they need?

Show the answer

Answer: A

Correct answer: About 5.1 days. Estimate first: the answer must be less than 9 days and more than half of 9, or 4.5 days.

Exactly:

per day, so the time is

days
  • A (correct): The combined rate is 7/36 of the job per day, so the time is 36/7, which is about 5.1 days and lies between 4.5 and 9 days as it must.
  • B: This is less than half of the faster carpenter's 9 days, which is impossible because the partner is slower.
  • C: This averages the two times, but working together must be faster than either person alone.
  • D: This adds the two times instead of adding the rates.
Practice 24 of 35 · easy

A maintenance crew can strip the old paint from a ship's deck in 20 hours. How many hours will the crew need to strip 3/4 of the deck?

Show the answer

Answer: B

Correct answer: 15 hours. Time = work / rate. The rate is of the deck per hour, so

  • A: This is the time for the remaining 1/4 of the deck, not for 3/4 of it.
  • B (correct): At 1/20 of the deck per hour, 3/4 of the deck takes 3/4 divided by 1/20, or 15 hours.
  • C: This divides 20 by 3/4, which gives more time for less than the whole deck.
  • D: This divides 20 by 1/4, mixing up the part of the deck with the part left over.
Practice 25 of 35 · medium

Two stamping presses running together turn out 900 brackets per hour. Press A alone turns out 520 brackets per hour. How many hours would press B need, running alone, to make 2,280 brackets?

Show the answer

Answer: A

Correct answer: 6 hours. Find the unknown rate by subtraction:

900 - 520 = 380

brackets per hour for press B.

Time =

2,280 / 380 = 6 hours
  • A (correct): Press B makes 900 - 520 = 380 brackets per hour, and 2,280 / 380 = 6 hours.
  • B: This uses the combined rate of 900 per hour even though press B runs alone.
  • C: This uses press A's rate of 520 per hour instead of press B's rate.
  • D: This adds 900 and 520 instead of subtracting to find press B's rate.
Practice 26 of 35 · medium

One snowplow driver can clear a parking lot in 4 hours, and another driver can clear it in 6 hours. If both drivers plow the lot at the same time, how long will it take?

Show the answer

Answer: B

Correct answer: 2 hours 24 minutes. Add the rates:

of the lot per hour.

Invert:

hours

Convert the decimal: 0.4 x 60 = 24 minutes, so 2 hours 24 minutes.

  • A: This reads 2.4 hours as 2 hours 40 minutes; 0.4 hour is 0.4 x 60 = 24 minutes.
  • B (correct): The combined rate is 5/12 of the lot per hour, so the time is 12/5 = 2.4 hours, and 0.4 hour is 24 minutes.
  • C: This averages the two times; the team must beat the faster driver's 4 hours.
  • D: This adds the times instead of adding the rates.
Practice 27 of 35 · hard

Two volunteers can each pack a shipment of relief supplies alone, one in 12 hours and the other in 24 hours. They work together for 4 hours, and then a third volunteer who could pack the shipment alone in 8 hours joins them. How many hours does the whole job take?

Show the answer

Answer: C

Correct answer: 6 hours. Stage 1:

per hour, so 4 hours finishes .

Stage 2:

per hour, so the remaining half takes

hours

Total:

4 + 2 = 6 hours
  • A: This is only the time after the third volunteer joins; the first 4 hours must be added.
  • B: This is the time if all three had worked together from the start.
  • C (correct): The first two finish 1/2 in 4 hours; all three pack 1/4 per hour, so the second half takes 2 hours, for 6 hours in all.
  • D: This is how long the first two volunteers would need for the whole job without the third.
Practice 28 of 35 · medium

A livestock water trough is half full. Its inlet valve can fill an empty trough in 10 hours, and a leak can empty a full trough in 15 hours. With the inlet open and the leak flowing, how long will it take to fill the trough the rest of the way?

Show the answer

Answer: C

Correct answer: 15 hours. Net rate:

trough per hour.

Only half the trough remains:

hours
  • A: This is the time to fill a completely empty trough; only half the trough still needs water.
  • B: This adds the leak's rate to the inlet's rate instead of subtracting it.
  • C (correct): The net rate is 1/10 - 1/15 = 1/30 trough per hour, and the remaining 1/2 trough takes 15 hours.
  • D: This subtracts the times (15 - 10) instead of the rates.
Practice 29 of 35 · easy

During a storm, snow piles up on a roof at 3 inches per hour while melting removes 1 inch per hour. Starting with a bare roof, how many hours will it take for 8 inches of snow to build up?

Show the answer

Answer: A

Correct answer: 4 hours. Opposing rates subtract: net buildup =

3 - 1 = 2 inches

per hour.

Time =

8 / 2 = 4 hours
  • A (correct): The snow depth grows by 3 - 1 = 2 inches per hour, and 8 / 2 = 4 hours.
  • B: This adds the melting rate to the snowfall rate instead of subtracting it.
  • C: This uses the snowfall rate alone and ignores the melting.
  • D: This divides by the melting rate of 1 inch per hour, which does not measure the buildup.
Practice 30 of 35 · hard

Workers A, B and C can each insulate an attic alone in 6, 10 and 15 hours, respectively. A and B start together. After 2 hours, A leaves and C joins B. How many more hours will B and C need to finish the attic?

Show the answer

Answer: D

Correct answer: 2.8 hours. Call the job 30 units. A, B and C do 5, 3 and 2 units per hour.

Stage 1: A and B do 8 units per hour, so 16 units in 2 hours, leaving 14 units. Stage 2: B and C do 5 units per hour, so

14 / 5 = 2.8 hours
  • A: This is the total elapsed time; the question asks only for the time after C joins.
  • B: This is the time if all three worked together on the whole attic from the start.
  • C: This lets C finish the remaining 7/15 alone and leaves out B's continued work.
  • D (correct): A and B finish 8/15 in 2 hours, leaving 7/15; B and C do 1/6 per hour, so the rest takes 2.8 hours.
Practice 31 of 35 · medium

Worker A can seal one driveway in 3 hours, and worker B can seal one driveway in 6 hours. Working together at these rates, how many hours will they need to seal 3 identical driveways?

Show the answer

Answer: A

Correct answer: 6 hours. First state what one job is: one driveway. Combined rate:

driveway per hour.

For 3 driveways:

hours
  • A (correct): Together they seal 1/3 + 1/6 = 1/2 driveway per hour, so 3 driveways take 3 / (1/2) = 6 hours.
  • B: This is the time for one driveway; the job here is three driveways.
  • C: This averages the two workers' times (4.5 hours) and multiplies by 3 instead of adding rates.
  • D: This multiplies 3 driveways by the rate of 1/2 driveway per hour instead of dividing.
Practice 32 of 35 · medium

Two dredges working together can clear silt from a harbor channel in 10 days. The larger dredge working alone needs 14 days. How many days would the smaller dredge need to clear the channel alone?

Show the answer

Answer: C

Correct answer: 35 days. Unknown rate = team rate - known rate:

The smaller dredge alone needs 35 days.

  • A: This subtracts the times (14 - 10) instead of the rates.
  • B: This adds the two times, which does not give the missing worker's time.
  • C (correct): The smaller dredge's rate is 1/10 - 1/14 = 4/140 = 1/35 per day, so it needs 35 days.
  • D: This adds the team rate and the larger dredge's rate instead of subtracting.
Practice 33 of 35 · easy

Two airmen are washing a cargo plane. One can wash it alone in 2 hours, and the other can wash it alone in 3 hours. Working together, how long will it take them?

Show the answer

Answer: C

Correct answer: 1 hour 12 minutes. Add the rates:

per hour.

Invert:

hours

and 0.2 x 60 = 12 minutes, so 1 hour 12 minutes.

  • A: This averages the two times; the pair must be faster than the faster airman.
  • B: This adds the two times instead of adding the rates.
  • C (correct): Together they do 5/6 of the job per hour, so the time is 6/5 = 1.2 hours, and 0.2 hour is 12 minutes.
  • D: This reads 1.2 hours as 1 hour 20 minutes; 0.2 hour is 0.2 x 60 = 12 minutes.
Practice 34 of 35 · hard

Inlet A can fill an empty cistern in 6 hours. Inlet A runs alone for 2 hours. Then inlet B, which can fill the cistern in 12 hours, is opened, and at the same moment a drain that can empty the full cistern in 8 hours is also opened. All three stay open until the cistern is full. How long does it take to fill the cistern from the start?

Show the answer

Answer: D

Correct answer: 7 hours 20 minutes. Stage 1:

filled, so remains.

Stage 2 net rate:

per hour, so

hours

= 5 hours 20 minutes.

Total: 2 hours + 5 hours 20 minutes = 7 hours 20 minutes.

  • A: This is only the time after inlet B and the drain open; the first 2 hours must be added.
  • B: This is the time to fill the whole cistern at the net rate of 1/8, ignoring the 1/3 already filled.
  • C: This adds the drain's rate as if it were filling, instead of subtracting it.
  • D (correct): Inlet A fills 1/3 in 2 hours; the net rate then is 1/8 per hour, so the remaining 2/3 takes 16/3 hours, giving 7 hours 20 minutes in all.
Practice 35 of 35 · medium

A tile setter can tile a bathroom floor alone in 12 hours, and a helper can tile it alone in 15 hours. They work together for 4 hours and then stop for the day. What fraction of the floor is still untiled?

Show the answer

Answer: B

Correct answer: 2/5. Combined rate:

per hour.

Work done in 4 hours:

Remaining:

  • A: This is the fraction already tiled, not the fraction still untiled.
  • B (correct): Together they tile 3/20 per hour, so 4 hours covers 3/5 of the floor and 2/5 remains.
  • C: This counts only the tile setter's 4/12 and leaves out the helper's work.
  • D: This treats the pair as needing 12 + 15 = 27 hours, adding times instead of rates.

About this test

Each question has an explanation that expresses rates as fractions of a job per hour and adds or subtracts them as needed. For fill and drain items, the explanation shows clearly which rate works against the other.

After scoring, match each miss to its source. Partial-work or team-change errors call for a second read of those sections; unknown-rate errors point to finding an unknown worker rate. More work is available in the 35 extra practice questions for this lesson. Please read your result as practice accuracy only, not as an ASVAB or AFQT score.

Take it with you: the free app

The same 124 lessons, 6,516 questions and 82 timed practice tests on your phone, plus flashcards with spaced review and progress tracking. Free to download, and it works offline.

  • Works offline
  • Spaced-review flashcards
  • Progress for every subtest
  • Menus in 59 languages
ASVAB Camp appGoogle Play